Manhole (1)
Manhole by Type (2)
| BRICK |
| COMPOSITE |
| OTHERS |
| PLASTIC |
| PRE-CAST CONCRETE |
| REINFORCED CONCRETE |
| UNKNOWN |
Manhole by DOE Standard (3)
Force Main Valve location (4)
Gravity (6)
Inverted Siphon (7)
Force Mains (8)
Vacuum System (9)
Gravity Mains by Material (10)
| ABS Plastic |
| Asbestos Cement |
| Cast Iron |
| Cured in Place Lining |
| Ductile Iron |
| Glass Reinforced Plastic |
| High Density Polyethylene |
| Mild Steel |
| Modified PVC |
| Polyester Resin Concrete |
| Reinforced Concrete |
| Salt Glazed Ware Pipe |
| Spiral Wound |
| Stainless Steel |
| Unplasticized Polyvinyl Chloride |
| Vitrified Clay |
Pressurized Mains by Material (11)
| ABS Plastic |
| Asbestos Cement |
| Cast Iron |
| Cured in Place Lining |
| Ductile Iron |
| Glass Reinforced Plastic |
| high Density Polyethylene |
| Mild Steel |
| Modified PVC |
| Polyester Resin Concrete |
| Reinforced Concrete |
| Salt Glazed Ware Pipe |
| Spiral Wound |
| Stainless Steel |
| Unplasticized Polyvinyl Chloride |
| Vitrified Clay |
Gravity Mains by Diameter (mm) (12)
| ≤225.00 |
| 225.01 - 500.00 |
| 500.01 - 1000.00 |
| >1000.00 |
Pressurized Mains by Diameter (mm) (13)
| ≤230.00 |
| 230.01 - 500.00 |
| 500.01 - 1000.00 |
| >10000.00 |
Gravity Mains by Age (14)
| ≤ 4 years |
| '>5-10 years |
| '10-20 years |
| '20-30 years |
| '30-40 years |
| '40-50 years |
| '>50 years |
| Other |
Pressurized Mains by Age (15)
| ≤ 4 years |
| '>5-10 years |
| '10-20 years |
| '20-30 years |
| '30-40 years |
| '40-50 years |
| '>50 years |
| Other |
Gravity Mains by Take Over (16)
| T01 - Block Takeover |
| T02 - Design Approved by LA |
| T03 - Force Takeover |
| T04 - As Per Guideline |
| TO5A - Decommisioned |
| TO5F - Demolished |
Pressurized Mains by by Take Over (17)
| TO1 - Block Take Over |
| TO2 - Design Approve by LA |
| TO3 - Forced Takeover |
| TO4 - Design as Per Guidelines |
| TO5A - Decommissioned |
| TO5F - Sewerage System and Premises Demolished and Not Used Anymore |
Gravity Mains by Goverment Take Over (18)
| T06-1 - Government Asset Takeover from Block Takeover, Design Approved by LA, Forced Taekover and IWK Initiatives |
| T06-4 - Government Asset Takeover with Design as Per Guideline |
Pressurized Mains by by Goverment Take Over (19)
| T06-1 - Government Asset Takeover from Block Takeover, Design Approved by LA, Forced Taekover and IWK Initiatives |
| T06-4 - Government Asset Takeover with Design as Per Guideline |
Gravity Mains (21)
Pressurized Mains (22)
Length Gravity Mains & Pressurized Mains (Dashboard) (23)
RAC Railway Crosss Location (24)
Network Vehicle Staus (25)
| On |
| Off |
Fleet Section NET (26)
IWK Sampling Point (33)
Manhole on Private Network (35)
Private Lines (36)
Private STP (37)
Private NPS (38)
Private SSTS (39)
Individual Septic Tank (IST) (40)
Pour Flush (PF) (41)
Private STP Service Area (42)
Private NPS Service Area (43)
Asset Nearby Riverbank (44)
Sewerline Nearby (45)
| Riverbank |
| Critical Slope |
|