N05-Inspection - Spot CCTV (1)
N06 - Maintenance - PPM MH (2)
N09-Construction - New MH (3)
N10-Maintenance - Manhole Blockage (4)
N11 - Maintenance - Private Blockage (5)
N12 - Maintenance - Public Blockage (6)
N14 - Repair - Patching (7)
N15 - Repair - Tophat (8)
N19-Repair - MH cover (9)
N20-Repair - Internal MH (10)
N23-Replacement - MH (11)
N24 - Maintenance - Locate MH (12)
N25 - Maintenance - Install MH Slab (13)
N27 - Repair - Equipments (14)
N29 - Route - Vacuum Inspection (15)
N30 - PPM - Vacuum Sewer (16)
Others (17)
| Others |
C01-CONSTRUCTION/DESIGN (19)
C02-INFERIOR PARTS (20)
C05-WEAR AND TEAR (21)
C06-ENVIRONMENT (22)
C08-HANDLED MATERIAL (23)
C11-NO PREVENTIVE MAINTENANCE (24)
C16-THIRD PARTY DAMAGE (25)
C22-ILLEGAL DUMPING (RUBBISH) (26)
C23-ROOTS (27)
C24-OIL/GREASE/FAT (28)
OTHERS (29)
BRN-BURN MARK (31)
CLR-ABNORMAL COLOUR (32)
COR-CORROSION (33)
FLD-FLOOD (34)
LEK-LEAKING (35)
LOW-LOW OUTPUT (36)
NSY-ABNORMAL NOISE/SOUND (37)
ODR-STRANGE ODOUR (38)
OFL-OVERFLOW (39)
SCH-SURCHARGE/HIGH LEVEL (40)
SMK-EXCESSIVE SMOKE (41)
TFT-THEFT CASE (42)
TMP-HIGH (43)
TEMPREATURE/OVERHEATING (44)
TRP-FREQUENT TRIPPING (45)
UNB-UNBALANCED (46)
VIB-HEAVY VIBRATION (47)
OTHERS (48)
COMPLETED (50)
IN PROGRESS (51)
PLANNED (52)
OTHERS (53)
N01 - Inspection - MH to MH CCTV (55)
N02 - Inspection - DLP CCTV (56)
N03 - Repair - Force Main System (57)
N04-Repair - Gravity System (58)
N07 - Maintenance - PPM Sewer 1/10Y (59)
N08 - Maintenance - PPM Sewer HA (60)
N13 - Repair - Private System (61)
N16 - Construction - Pipe Jacking (62)
N17 - Replacement - Pipe Bursting (63)
N18 - Replacement - Pipe Rehab (64)
N22-Repair - Bypass pipe (65)
Others (66)
C01-CONSTRUCTION/DESIGN (68)
C02-INFERIOR PARTS (69)
C05-WEAR AND TEAR (70)
C06-ENVIRONMENT (71)
C08-HANDLED MATERIAL (72)
C11-NO PREVENTIVE MAINTENANCE (73)
C16-THIRD PARTY DAMAGE (74)
C22-ILLEGAL DUMPING (RUBBISH) (75)
C23-ROOTS (76)
C24-OIL/GREASE/FAT (77)
OTHERS (78)
BRN-BURN MARK (80)
CLR-ABNORMAL COLOUR (81)
COR-CORROSION (82)
FLD-FLOOD (83)
LEK-LEAKING (84)
LOW-LOW OUTPUT (85)
NSY-ABNORMAL NOISE/SOUND (86)
ODR-STRANGE ODOUR (87)
OFL-OVERFLOW (88)
SCH-SURCHARGE/HIGH LEVEL (89)
SMK-EXCESSIVE SMOKE (90)
TFT-THEFT CASE (91)
TMP-HIGH (92)
TEMPREATURE/OVERHEATING (93)
TRP-FREQUENT TRIPPING (94)
UNB-UNBALANCED (95)
VIB-HEAVY VIBRATION (96)
OTHERS (97)
COMPLETED (99)
IN PROGRESS (100)
PLANNED (101)
OTHERS (102)
Risk Sewerline by Category (103)
| OTHERS |
| Asset Risk |
| Operational Risk |
Risk Sewerline by Status (104)
| OTHERS |
| Approved by RMC |
| Approved by URMC |
| Escalate to RMC |
| Escalate to URMC |
| In Hold URMC |
| Revert to Risk Owner |
| Submitted by Risk Focal |
Risk Sewerline by Subcategory (105)
| OTHERS |
| Illegal Waste |
| STP/NPS/STF |
| Sewer Network |
| Theft |
|